FAMILY HOUSE, Herakovo village, Sofia

Client: Private Location: Herakovo village, Sofia Year: 2022 Technical parameters: Total area 270 sq.m.  The house is single-family residential building. The building is two-storey without a basement. The house has one main entrance. It is possible to enter the house through the garage or through the living room. On the first floor [...]

By |2023-06-02T13:14:00+00:00June 2nd, 2023|Exterior|0 Comments

FAMILY HOUSE, Simeonovo District, Sofia

Client: Private Location: Simeonovo District, Sofia Year: 2019 Located in Simeonovo, Sofia city; total area of 750 sq.m. Single-family residential building for all-year-round living. The building is spread over three floors: basement, ground floor and residential floor. Basement - an underground garage for two cars, a seating area equipped with a bar and [...]

By |2019-11-30T16:55:25+00:00November 30th, 2019|Exterior|0 Comments

“LYUBEN KARAVELOV” HIGH SCHOOL, VIDIN

Client: "Liuben Karavelov" High School Location: Vidin City, Bulgaria Year: 2012 Renewal of construction documents and a project for renovation of the building. Land area of 16 003 sq.m.; total building area of 9452,5 sq.m. After the inspection, construction documents were prepared and renewed. On their basis a project for roof repair, [...]

By |2019-11-30T16:09:23+00:00November 24th, 2019|Exterior, Interior|0 Comments

Reception, Hotel Sevastopol, Ruse

Client: Hotel Sevastopol Location: Ruse, Bulgaria Year: 2018 We present to you a project for the Reception of the Sevastopol Hotel located in the town of Rousse. The project presents a complete concept for functional distribution, design, as well as a complete detailed project for the implementation of the individual zones. The [...]

By |2019-11-30T16:10:32+00:00November 21st, 2019|Exterior, Interior|0 Comments

MEAT PROCESSING FACILITY AND BUTCHER’S SHOP, SIMITLY TOWN

Client: MARTA-SKM Location: Simitly Town Year: 2017 MEAT PROCESSING FACILITY AND BUTCHER’S SHOP – based in the town of Simitli, with a daily production capacity of 2500 kg. Two-story building which houses a facility for producing minced meat and other meat products, fully compliant with the existing hygienic regulations and the investor’s [...]

By |2019-11-30T16:13:21+00:00November 19th, 2019|Exterior|0 Comments